...."
Li Yu felt a bit of a headache listening to Ma Sailong, who seemed to never stop talking, enduring patiently for a few minutes, initially thinking it was over.
Ma Sailong swallowed and continued speaking enthusiastically:
"Moreover, using the method of dry cement sand construction with high sand carrying ratio + plugging material. During construction, increase the sand carrying ratio to the maximum to ensure more dry cement sand deposits and consolidates near the wellbore, forming a better artificial well wall nearby.
...."
Li Yu coughed and waved his hand asking:
"How long will the repair take? Is oil extraction suspended during the repair?"
Zuo Ruxue immediately responded:
"One week is enough for repairs, and all oil extraction operations need to be paused during the repair period. Also, after the repair, regular maintenance should continue every month."
